NJFX is redefining proximity by providing direct interconnection options at the cable-head without recurring costs on cross-connects. Phase one of the NJFX facility build opened in 2015 with DC power and AC power available upon reservation, and phase two opened September 2016, offering high and low-density solutions for strategic deployments.

Watch the project evolve in the above time-lapse video.